Place of Origin: | CHINA |
Brand Name: | ZHAOLI |
Certification: | CE |
Model Number: | DXJ |
Minimum Order Quantity: | 1 set |
---|---|
Price: | Negotiable |
Packaging Details: | semi-automatic slotting corrugated carton box stitching machine : plastic film |
Delivery Time: | 30 days after receive deposit |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union |
Supply Ability: | 30 sets per month |
Product Name: | Semi-automatic Slotting Corrugated Carton Box Stitching Machine | Function: | Carton Box Stitching |
---|---|---|---|
Automatic Type: | Semi-automatic | Speed: | 400nails/min |
Model: | DXJ-2000 | Feature: | Change Order One Minutes |
Other Name: | Semi-automatic Speeding Corrugated Carton Box Stitching Machine | ||
High Light: | carton stitching machine,semi auto stitching machine |
Semi-automatic Slotting Corrugated Carton Box Stitching Machine
Machine features:
1 One minute quick order change.The whole machine adopt full electrical control,easy to operate, no training.
2 Single, double, supplement stitching are available.
3 Stitching pitch is 20-160mm, automatic caculate stitching pitch; servo motor from Taiwan to control stitching pitch.
4 Touch screen adopt Taiwan Eview brand, 5.7 inch high definition colorful display touch screen.
5 The latter department automatic counter, can design as 1-99, easy to binding.
6 Head and fork material main is exported alloy steel, made through special heat treatment process.
7 The max unfolded single sheet width is 4m, min is 1m.
8 Stitching whatever the carton have cover or not, the first stitch pitch is 20mm.
9 Adopt Germany timing belt to send the paperboard, can avoid the price scissors. Adjust feeding paperboard timing belt electrically, adjust head size electriclly to fasten change order speed.
10 Working table up and down automaticlly.
Technology:
max working size (length+width)x2 | 2460mm |
min working size (length+width)x2 | 606mm |
max working size (width+height)x2 | 1515mm |
min working size (width+height)x2 | 300mm |
height of table | 900mm |
speed | 400nails/min |
power | 4kw |
machine size | 2.8x2.6x1.7m |
machine weight | 2000kg |
stitching pitch | 30-100mm |
Package:
The normal package is plastic film(Size: L*W*H). If export to european countries,the wooden box will be fumigated.If container is too tigher,we will use pe film for packing or pack it according to customers special request.
pictures:
Corrugated Cardboard Printer Slotter Die Cutting Machine With Stacker
High Speed Flexo Printer Slotter Machine / Flexo Printing Machine CE Certificate
Automatic Flexo Printer Slotter Machine 1 - 4 Colors Printing Fit Carton Box
Flexible Movement Flexo Printer Slotter Machine With Full Computer Control
Precision Cardboard Box Cutting Machine Computer Straight Spiral Blade NC Cut Off
High Speed Corrugated Cardboard Machine With Computer NC Sheet Cut Off
Corrugated Cardboard Cutting Machine / Automatic Corrugation Machine
2 Layer Automatic Corrugated Cardboard Production Line 30 Meters Length
Touch Screen Control Partition Assembly Machines High Efficiency And Energy Saving
Carton Box Package Making Partition Assembler / Corrugated Partition Machine
Cardboard Partition Assemble Machine Longitudinal Feeding Shaft Adopts Electric Lifting
Reduce Manpower Cost Partition Assembly Machines With Long Service Life